Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2019, 06:40 AM
  • 14_1_1_02052019_235147.mp4

Date
05/02/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12261
Time
11:40 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6522
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0335
Downstream MH
15 0334
Dir. of Survey
Downstream
Length Surveyed
147.4 ft.
Total Length
147.4 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
149
Pipe schematic from manhole 15 0335 to 15 0334
MH: 15 0335MH: 15 0334downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 03352 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start129.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish144.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish147.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0334

Observation photos (2)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK
129.1TBA
147.4AMH15 0334
2SSS
144.9SSS
0MWM
144.9SAP
2SAP
0MWL
0AMH15 0335

Properties (6)

additional_info
SC366242
custom_field_two
3
customer
LACSD
datetime
2019-05-02T23:40:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false