14_1_1_15052019_024038.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
11.7 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES
145.3 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES
276.3 ft. - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: YES
327.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 93 | TBA | — |
| 2 | SSS | — |
| 371.3 | TBA | — |
| 11.7 | SRV | — |
| 276.3 | SRV | — |
| 251.6 | TBA | — |
| 440 | SRV | — |
| 441.7 | AMH | 14 0069 |
| 440 | SSS | — |
| 0 | AMH | 14 0070 |
| 327.5 | SRV | — |
| 145.3 | SRV | — |
| 2 | SAP | — |
| 2 | DAGS | — |
| 0 | MWM | — |
| 430.2 | TBA | — |
| 440 | SAP | — |
| 312.2 | TBA | — |
| 440 | DAGS | — |
| 0 | MWL | — |