Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2019, 09:01 AM
  • 20 0142_20 0141 _26032019_021046.mp4

Date
03/26/2019
W/O
755976
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19065
Time
2:01 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6435
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_755976_TV20029_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0142
Downstream MH
20 0141
Dir. of Survey
Downstream
Length Surveyed
178.5 ft.
Total Length
178.5 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
175
O&M Index
2
O&M Quick
2F00
O&M Rating
70
Overall Index
2
Overall Quick
Overall Rating
245
Pipe schematic from manhole 20 0142 to 20 0141
MH: 20 0142MH: 20 0141downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01420 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start21.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"164.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish176.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish176.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish178.5 ft. AMH - Downstream Manhole, Survey Ends - 20 0141178.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observations (19)

DistanceCodeObservation
178.5AMH20 0141
95.6TFC
0MWL
2SAP
176.2SSS
164.4TFC
21.1TFC
0AMH20 0142
0MWM
178.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
44.5TF
2SSS
72.3TFC
176.2SAP
132.6TB
176.2DAGS
118.1TFC
141.8TFC
2DAGS

Properties (6)

additional_info
SC366203
custom_field_two
2
customer
LACSD
datetime
2019-03-26T02:01:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false