Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2019, 06:00 AM
  • 20 0152_20 0151_28032019_231659.mp4

Date
03/28/2019
W/O
755976
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19075
Time
11:00 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6438
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_755976_TV20029_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0152
Downstream MH
20 0151
Dir. of Survey
Downstream
Length Surveyed
308.7 ft.
Total Length
308.7 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
412K
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
431
Pipe schematic from manhole 20 0152 to 20 0151
MH: 20 0152MH: 20 0151downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01520 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start30.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"106.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"130.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"154.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"229 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"308.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish308.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish308.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish308.7 ft. AMH - Downstream Manhole, Survey Ends - 20 0151

Observations (22)

DistanceCodeObservation
308.1SSS
253.4TFC
2SAP
30.9TFC
308.1SAP
54.7TFC
277.9TFC
78.1TFC
0AMH20 0152
130.4TFC
154.1TFC
106.4TFC
300.8TFC
2SSS
229TFA
177.7TFC
205.3TFC
308.7AMH20 0151
0MWL
2DAGS
0MWM
308.1DAGS

Properties (6)

additional_info
SC366206
custom_field_two
2
customer
LACSD
datetime
2019-03-28T23:00:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false