Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2019, 07:21 AM
  • 20 0146_20 0145_26032019_003644.mp4

Date
03/26/2019
W/O
755976
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19069
Time
12:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6435
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_755976_TV20029_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0146
Downstream MH
20 0145
Dir. of Survey
Downstream
Length Surveyed
394.8 ft.
Total Length
394.8 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
2
O&M Quick
2O00
O&M Rating
156
Overall Index
2
Overall Quick
Overall Rating
546
Pipe schematic from manhole 20 0146 to 20 0145
MH: 20 0146MH: 20 0145downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01460 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start63.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"94.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"302.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"358.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"393.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish393.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish393.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish394.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK394.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0145

Observations (18)

DistanceCodeObservation
0MWL
122.6TFC
0AMH20 0146
393.8SSS
150.8TFC
302.2TFC
394.8MGOACTIVE CONNECTION AT MH 3 O'CLOCK
393.8SAP
358.4TFC
0MWM
2DAGS
94.5TFC
63.5TFC
394.8AMH20 0145
2SAP
2SSS
242.1TFC
393.8DAGS

Properties (6)

additional_info
SC366203
custom_field_two
2
customer
LACSD
datetime
2019-03-26T00:21:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false