Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2019, 08:41 AM
  • 20 0143_20 0142 _26032019_020031.mp4

Date
03/26/2019
W/O
755976
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19066
Time
1:41 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6435
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_755976_TV20029_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0143
Downstream MH
20 0142
Dir. of Survey
Downstream
Length Surveyed
374.2 ft.
Total Length
374.2 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
3122
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
17
Pipe schematic from manhole 20 0143 to 20 0142
MH: 20 0143MH: 20 0142downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01432 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"24.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"53 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"77.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"171.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"224.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.6 ft. OBR - Obstacles Rocks, 15 %of cross sectional area, from 05 to 07 o'clock248.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"295.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"345.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"364.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"371.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish374.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0142

Observations (28)

DistanceCodeObservation
2DAGS
2SSS
53TFC
224.7TF
100.2TFC
295.5TFC
371.3SAP
371.3SSS
24.8TF
364.9TF
231.6OBR
6.8TFC
345.1TFC
77.2TF
272.1TFC
124.4TFC
0MWL
149TFC
2SAP
374.2AMH20 0142
371.3DAGS
171.9TB
322.2TF
200.3TFC
177.5TFC
0MWM
248.1TFC
0AMH20 0143

Properties (6)

additional_info
SC366203
custom_field_two
2
customer
LACSD
datetime
2019-03-26T01:41:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false