Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2019, 11:17 AM
  • 18 0283_18 0282 _06032019_043339.mp4

Date
06/03/2019
W/O
766532
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00702
PipeID
P14111
Time
4:17 AM
Certificate
U-109-7984
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6068
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
WO_766532_TV18178_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0283
Downstream MH
18 0282
Dir. of Survey
Downstream
Length Surveyed
357.8 ft.
Total Length
357.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0283 to 18 0282
MH: 18 0283MH: 18 0282downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 02830 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. MGO - General Observation - MAGNEZIUM H.O COATING start53.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"56.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"256.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"305.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"308.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"355.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish357.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0282

Observations (19)

DistanceCodeObservation
53.4TFC
355.9MGOMAGNEZIUM H.O COATING finish
56.5TFC
153.2TFC
0AMH18 0283
0MGOCONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH
357.8AMH18 0282
205.1TFC
0MWL
2MGOMAGNEZIUM H.O COATING start
308.7TF
0MWM
156.4TFC
256.9TFC
254TFC
102.5TFC
104.8TFC
208.3TFC
305.9TFC

Properties (6)

additional_info
SC377912
custom_field_two
3
customer
LACSD
datetime
2019-06-03T04:17:02-07:00
documentation
PRO PIPE
is_lateral_inspection
false