Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2019, 08:56 AM
  • E 0065_E 0064_06032019_020733.mp4

Date
06/03/2019
W/O
766543
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00030
PipeID
P11295
Time
1:56 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6557
Sewer Name
E JOINT OUTFALL E - UNIT 4
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_766543_TV01079_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
E 0065
Downstream MH
E 0064
Dir. of Survey
Downstream
Length Surveyed
338.4 ft.
Total Length
338.4 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
412L
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
473
Pipe schematic from manhole E 0065 to E 0064
MH: E 0065MH: E 0064downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00650 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2.5 ft. MGO - General Observation - MAG COAT THROUGHOUT PIPE2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start336.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish336.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish336.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338.4 ft. AMH - Downstream Manhole, Survey Ends - E 0064

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2.5MGOMAG COAT THROUGHOUT PIPE
336.6SAP
336.3SSS
2.5SAP
0AMHE 0065
338.4AMHE 0064
336.3DAGS
0MWL
2.5DAGS
0MWM
2.5SSS

Properties (6)

additional_info
SC377679
custom_field_two
3
customer
LACSD
datetime
2019-06-03T01:56:43-07:00
documentation
PROPIPE
is_lateral_inspection
false