Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2019, 06:49 AM
  • 29 0003_29 0002_06182019_000047.mp4

Date
06/17/2019
W/O
766511
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00849
PipeID
P17677
Time
11:49 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6567
Sewer Name
29 SIGNAL HILL OUTFALL TRUNK
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
19
Purpose
Routine Assessment
Project
WO_766511_TV29096_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
29 0003
Downstream MH
29 0002
Dir. of Survey
Downstream
Length Surveyed
334.9 ft.
Total Length
334.9 ft.
Structural Index
5
Structural Quick
5331
Structural Rating
18
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
5
Overall Quick
Overall Rating
18
Pipe schematic from manhole 29 0003 to 29 0002
MH: 29 0003MH: 29 0002downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 00030 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area5.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start16.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start16.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start33 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish68.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start203.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish221.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start266 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish332.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish334.9 ft. AMH - Downstream Manhole, Survey Ends - 29 0002

Observation photos (4)

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    16.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    16.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    68.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    221.6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
68.2SRV
221.6SRV
332.9SAP
33SRV
5.9MGOMAGNEZIUM H.O COATING start
16.1SRV
0AMH29 0003
16.1SAP
266SRV
203.9SRV
334.9AMH29 0002
0MWM
0MWL

Properties (6)

additional_info
SC377692
custom_field_two
2
customer
LACSD
datetime
2019-06-17T23:49:07-07:00
documentation
PROPIPE
is_lateral_inspection
false