Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 5, 2018, 04:42 AM
  • 02 1323_02 1322_04092018_215639.mp4

Date
09/04/2018
W/O
723786
Weather
Dry
Operator/Surveyor
B. FUGATE
Sewer ID
Z00238
PipeID
P03845
Time
9:42 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5994
Sewer Name
02 BELVEDERE TRUNK
City
EAST LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_723786_TV02239_SEP2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1323
Downstream MH
02 1322
Dir. of Survey
Downstream
Length Surveyed
339.9 ft.
Total Length
339.9 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
201
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
201
Pipe schematic from manhole 02 1323 to 02 1322
MH: 02 1323MH: 02 1322downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 13230 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area3.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.9 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"170.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"204.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"226.1 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"232 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"299.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"302.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"329.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"339.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.9 ft. AMH - Downstream Manhole, Survey Ends - 02 1322

Observations (21)

DistanceCodeObservation
302.9TFC
204.3TF
68.1TF
170.6TBA
339.9CM
120.8TFC
165.9TB
0MWM
329.1TB
3.1CM
0AMH02 1323
339.9AMH02 1322
54.6TF
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
226.1TB
3.1TF
105.6TF
126.1TF
232TF
299.4TB

Properties (5)

additional_info
SC364808
customer
LACSD
datetime
2018-09-04T21:42:00-07:00
documentation
PROPIPE
is_lateral_inspection
false