Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2019, 03:55 PM
  • C 0347_C JOINT_8212019_104514.mp4

Date
08/21/2019
W/O
0643523
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00139
PipeID
P09810
Time
8:55 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8061
Sewer Name
C JOINT OUTFALL C - UNIT 8A
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
11
Purpose
Routine Assessment
Project
20190821DF_JOINT_OUTFALL_C_UNIT_8A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
C 0347
Downstream MH
C JOINT
Dir. of Survey
Downstream
Length Surveyed
514.5 ft.
Total Length
514.5 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
3
O&M Quick
443C
O&M Rating
81
Overall Index
3
Overall Quick
Overall Rating
96
Pipe schematic from manhole C 0347 to C JOINT
MH: C 0347MH: C JOINTdownstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:43 AM0.1 ft. MWM - Water Mark, 30 %of cross sectional area0.1 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.1 ft. ID - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES35.2 ft. ID - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES43 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES50.5 ft. MGP - General Photograph50.5 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES58.4 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES67 ft. ID - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES74.7 ft. ID - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES82.8 ft. ID - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES90.2 ft. ID - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES97.7 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES105.1 ft. ID - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES114.1 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES114.9 ft. MGP - General Photograph122.3 ft. IR - Infiltration Runner, at 11 o'clock, within 8 inches of joint: YES130.1 ft. IR - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES138 ft. ID - Infiltration Dripper, from 09 to 10 o'clock, within 8 inches of joint: YES145.4 ft. IR - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES161.2 ft. ID - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES169.6 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES185.7 ft. ID - Infiltration Dripper, from 11 to 01 o'clock, within 8 inches of joint: YES193.3 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES201.5 ft. IR - Infiltration Runner, at 01 o'clock, within 8 inches of joint: YES217.8 ft. ID - Infiltration Dripper, from 01 to 02 o'clock, within 8 inches of joint: YES230.4 ft. MGP - General Photograph248 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES356.8 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES377.5 ft. ID - Infiltration Dripper, from 11 to 12 o'clock, within 8 inches of joint: YES490.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, at 07 o'clock, , within 8 inches of joint: YES514 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 40% MAG514 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish514 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish514 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish514 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish514.5 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach514.5 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)514.5 ft. AMH - Downstream Manhole, Survey Ends - 12:12 PM

Observation photos (30)

  • Upstream Manhole, Survey Begins - 10:43 AM

    0 ft. - Upstream Manhole, Survey Begins - 10:43 AM

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

    35.2 ft. - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    43 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    50.5 ft. - General Photograph

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    50.5 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    58.4 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES

    67 ft. - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

    74.7 ft. - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES

    82.8 ft. - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES

    90.2 ft. - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    97.7 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

    105.1 ft. - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    114.1 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    114.9 ft. - General Photograph

  • Infiltration Runner, at 11 o'clock, within 8 inches of joint: YES

    122.3 ft. - Infiltration Runner, at 11 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES

    130.1 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, from 09 to 10 o'clock, within 8 inches of joint: YES

    138 ft. - Infiltration Dripper, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES

    145.4 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

    161.2 ft. - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    169.6 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, from 11 to 01 o'clock, within 8 inches of joint: YES

    185.7 ft. - Infiltration Dripper, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    193.3 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, at 01 o'clock, within 8 inches of joint: YES

    201.5 ft. - Infiltration Runner, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, from 01 to 02 o'clock, within 8 inches of joint: YES

    217.8 ft. - Infiltration Dripper, from 01 to 02 o'clock, within 8 inches of joint: YES

  • General Photograph

    230.4 ft. - General Photograph

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    356.8 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, at 07 o'clock,  , within 8 inches of joint: YES

    490.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, at 07 o'clock, , within 8 inches of joint: YES

Observations (45)

DistanceCodeObservation
2SZ40% MAG
67ID
130.1IR
377.5ID
26.1ID
74.7ID
50.5MGP
356.8ID
490.8DAE
514SZ40% MAG
514.5MGOPeeling & Flaking Throughout The Reach
514SRC
0.1MWM
58.4ID
97.7ID
2SRC
90.2ID
0.1MWL
50.5ID
2SSS
248ID
114.1ID
169.6ID
230.4MGP
2SAP
201.5IR
2SRV
514SAP
514SRV
105.1ID
185.7ID
161.2ID
145.4IR
114.9MGP
82.8ID
193.3ID
43ID
0AMH10:43 AM
217.8ID
514SSS
35.2ID
138ID
514.5MGOGREASE THROUGHOUT THE REACH (5%)
514.5AMH12:12 PM
122.3IR

Properties (6)

custom_field_three
SURFACE REINFORCEMENT PROJECTING/INFILTRATION RUNN
custom_field_two
2
customer
LACSD
datetime
2019-08-21T08:55:05-07:00
documentation
FRANKLIN, CASTILLO, IGNACIO, RUVALCABA, YOUNG
is_lateral_inspection
false