Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2015, 04:52 AM
  • 02 0228_02 0227_15092015_221608.mp4

Date
09/15/2015
W/O
521010
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00251
PipeID
P02534
Time
9:52 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2746
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
27
Purpose
Routine Assessment
Project
WO_521010_TV02055_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0228
Downstream MH
02 0227
Dir. of Survey
Downstream
Length Surveyed
375.7 ft.
Total Length
375.7 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 02 0228 to 02 0227
MH: 02 0228MH: 02 0227downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02280 ft. MGO - General Observation - SERVICE LATERAL AT 9 O'CLOCK AT MH0 ft. MWL - Water Level, 30 %of cross sectional area14.6 ft. CM - Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES17.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start35.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"38.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"154 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"201 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"269.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"273 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"344.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"347.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"375.7 ft. AMH - Downstream Manhole, Survey Ends - 02 0227375.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish375.7 ft. MGO - General Observation - SERVICE LATERAL AT 8 O' CLOCK AT MH

Observations (18)

DistanceCodeObservation
35.7TFC
14.6CM
38.5TFC
157.2TF
344.5TFC
201TBI
0MWM
0AMH02 0228
347.7TF
0MGOSERVICE LATERAL AT 9 O'CLOCK AT MH
375.7AMH02 0227
375.7CM
154TFC
375.7MGOSERVICE LATERAL AT 8 O' CLOCK AT MH
273TF
17.8CM
269.8TFC
0MWL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2015-09-15T21:52:44-07:00
documentation
PROPIPE
is_lateral_inspection
false