Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2015, 06:15 AM
  • 02 0272_02 0271_08092015_232843.mp4

Date
09/08/2015
W/O
521010
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00251
PipeID
P02586
Time
11:15 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2739
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
WO_521010_TV02055_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0272
Downstream MH
02 0271
Dir. of Survey
Downstream
Length Surveyed
292.4 ft.
Total Length
292.4 ft.
Structural Index
3
Structural Quick
3421
Structural Rating
14
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 02 0272 to 02 0271
MH: 02 0272MH: 02 0271downstream0 ft. MGO - General Observation - SERVICE LATERAL AT 9 O'CLOCK AT MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02720 ft. MWM - Water Mark, 30 %of cross sectional area4.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start13.5 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES14.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"16.6 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES20.3 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES57.7 ft. CM - Crack Multiple, from 03 to 04 o'clock, within 8 inches of joint: YES64.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start119.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"171.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"289 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish292.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish292.4 ft. AMH - Downstream Manhole, Survey Ends - 02 0271

Observations (16)

DistanceCodeObservation
289CM
13.5CM
16.6CL
171.6TF
14.8TFC
4.2DAGS
64.2CM
0MGOSERVICE LATERAL AT 9 O'CLOCK AT MH
57.7CM
119.6TFC
292.4DAGS
292.4AMH02 0271
0MWL
0AMH02 0272
0MWM
20.3CM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2015-09-08T23:15:36-07:00
documentation
PROPIPE
is_lateral_inspection
false