Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2015, 07:47 AM
  • 02 0259_02 1848_10092015_010029.mp4

Date
09/10/2015
W/O
521010
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00251
PipeID
P02570
Time
12:47 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2740
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
WO_521010_TV02055_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0259
Downstream MH
02 1848
Dir. of Survey
Downstream
Length Surveyed
216.6 ft.
Total Length
216.6 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
3
O&M Quick
4123
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
19
Pipe schematic from manhole 02 0259 to 02 1848
MH: 02 0259MH: 02 1848downstream0 ft. MGO - General Observation - SERVICE LATERAL AT 9 O'CLOCK AT MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02592.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start4.9 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES9.7 ft. CM - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES21.3 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start31 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"119.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO134.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"158.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start216.6 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish216.6 ft. AMH - Downstream Manhole, Survey Ends - 02 1848216.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish216.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish216.6 ft. MGO - General Observation - SERVICE LATERAL AT 9 O'CLOCK AT MH

Observations (17)

DistanceCodeObservation
216.6CM
31TFC
216.6AMH02 1848
134.5TFC
119.5DSZ
158.2DSZ
0MGOSERVICE LATERAL AT 9 O'CLOCK AT MH
9.7CM
216.6DSZ
21.3CM
0MWL
0MWM
0AMH02 0259
4.9CM
216.6DAGS
2.5DAGS
216.6MGOSERVICE LATERAL AT 9 O'CLOCK AT MH

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2015-09-10T00:47:47-07:00
documentation
PROPIPE
is_lateral_inspection
false