Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 18, 2015, 07:02 AM
  • 02 0203_02 0202_18092015_001751.mp4

Date
09/18/2015
W/O
521010
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00251
PipeID
P02511
Time
12:02 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2748
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
DOWNEY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
30
Purpose
Routine Assessment
Project
WO_521010_TV02055_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
02 0203
Downstream MH
02 0202
Dir. of Survey
Downstream
Length Surveyed
388.6 ft.
Total Length
388.6 ft.
Structural Index
2
Structural Quick
3211
Structural Rating
7
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 02 0203 to 02 0202
MH: 02 0203MH: 02 0202downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02030 ft. MWM - Water Mark, 30 %of cross sectional area19.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"21.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"21.9 ft. RBL - Roots Ball Lateral, at 10 o'clock, 65 %, within 8 inches of joint: NO26.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES68.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"121.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"135.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES169.2 ft. CC - Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES169.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"171.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"217.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"220.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"269.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"272.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"320.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.6 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES347.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES363.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"366.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"388.6 ft. MGO - General Observation - SERVICE LATERAL AT 9 O'CLOCK AT MH388.6 ft. AMH - Downstream Manhole, Survey Ends - 02 0202

Observations (27)

DistanceCodeObservation
269.6TFC
71.3TFC
0MWL
169.5TFC
347.9DSZ
121.5TF
320.7TF
220.4TF
171.3TFC
135.3DSZ
322.6CM
388.6MGOSERVICE LATERAL AT 9 O'CLOCK AT MH
0AMH02 0203
217.5TFC
317.9TFC
21.9TF
272.4TF
169.2CC
19.3TF
366.6TFC
21.9RBL
117.5TFC
0MWM
363.7TFC
388.6AMH02 0202
68.6TF
26.6CM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2015-09-18T00:02:08-07:00
documentation
PROPIPE
is_lateral_inspection
false