Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 10, 2015, 05:19 AM
  • 02 0271_02 0270_09092015_223150.mp4

Date
09/09/2015
W/O
521010
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00251
PipeID
P02585
Time
10:19 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2740
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
WO_521010_TV02055_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0271
Downstream MH
02 0270
Dir. of Survey
Downstream
Length Surveyed
292 ft.
Total Length
292 ft.
Structural Index
3
Structural Quick
3423
Structural Rating
18
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 02 0271 to 02 0270
MH: 02 0271MH: 02 0270downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02710 ft. MWM - Water Mark, 40 %of cross sectional area4.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: NO, Start4.7 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES20.6 ft. CM - Crack Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES30.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"39.4 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES44.4 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES78.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"83.8 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES107.9 ft. CM - Crack Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES128.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start227.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"289.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: NO, Finish289.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish292 ft. MGO - General Observation - SERVICE LATERAL AT 3 O' CLOCK AT MH292 ft. AMH - Downstream Manhole, Survey Ends - 02 0270

Observations (18)

DistanceCodeObservation
107.9CM
4.7DAGS
39.4CM
78.4TF
0MWL
292MGOSERVICE LATERAL AT 3 O' CLOCK AT MH
44.4CL
0AMH02 0271
0MWM
289.2DAGS
289.2CM
292AMH02 0270
227.6TFC
4.7CL
128.3CM
30.8TFC
83.8CL
20.6CM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2015-09-09T22:19:22-07:00
documentation
PROPIPE
is_lateral_inspection
false