Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 22, 2018, 06:57 AM
  • 32 0132A_32 0132_22082018_001042.mp4

Date
08/21/2018
W/O
723911
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19880
Time
11:57 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6008
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_723911_TV32048_SEP2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0132A
Downstream MH
32 0132
Dir. of Survey
Downstream
Length Surveyed
402.9 ft.
Total Length
402.9 ft.
Structural Index
3
Structural Quick
3O2N
Structural Rating
394
O&M Index
2
O&M Quick
2O00
O&M Rating
160
Overall Index
2
Overall Quick
Overall Rating
554
Pipe schematic from manhole 32 0132A to 32 0132
MH: 32 0132AMH: 32 0132downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 0132A0 ft. MWL - Water Level, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start402.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish402.9 ft. AMH - Downstream Manhole, Survey Ends - 32 0132402.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish402.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    19.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
402.9SAP
402.9AMH32 0132
402.9DAGS
19.5SSS
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
2DAGS
2SAP
402.9SSS
0AMH32 0132A
0MWL

Properties (6)

additional_info
SC364778
custom_field_two
2
customer
LACSD
datetime
2018-08-21T23:57:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false