Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 11, 2018, 09:29 AM
  • 21 0261A_21 0261 _11092018_024506.mp4

Date
09/11/2018
W/O
724275
Weather
Dry
Operator/Surveyor
B. FUGATE
Sewer ID
Z00763
PipeID
P15453
Time
2:29 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6000
Sewer Name
21 DISTRICT #21 OUTFALL TRUNK
City
CITY OF INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
36
Purpose
Routine Assessment
Project
WO_724275_TV21103_SEP2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
21 0261
Downstream MH
21 0261A
Dir. of Survey
Upstream
Length Surveyed
126.3 ft.
Total Length
126.3 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
30
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole 21 0261 to 21 0261A
MH: 21 0261MH: 21 0261Aupstream0 ft. MGO - General Observation - UNKNOWN CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 21 0261A1.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish52 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start124.2 ft. MGO - General Observation - MAG COAT - 40%126.3 ft. AMH - Downstream Manhole, Survey Begins - 21 0261126.3 ft. MWM - Water Mark, 25 %of cross sectional area126.3 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    74.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
74.3SAV
126.3MGOUNKNOWN CONNECTION AT MH 3 O'CLOCK
125SAV
0AMH21 0261
126.3AMH21 0261A
2.1MGOMAG COAT - 40%
0MWM
0MWL

Properties (6)

additional_info
SC364815
custom_field_two
3
customer
LACSD
datetime
2018-09-11T02:29:00-07:00
documentation
PROPIPE
is_lateral_inspection
false