Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 12, 2019, 07:40 AM
  • 20 0125_20 0124 _03122019_005332.mp4

Date
03/12/2019
W/O
750736
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19048
Time
12:40 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6422
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_750736_TV20027_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0124
Downstream MH
20 0125
Dir. of Survey
Upstream
Length Surveyed
374.7 ft.
Total Length
374.7 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
370
O&M Index
2
O&M Quick
2N00
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
518
Pipe schematic from manhole 20 0124 to 20 0125
MH: 20 0124MH: 20 0125upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01252.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish14.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"19.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"23.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"214.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"218.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"313.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"318.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"372.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start372.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start372.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start374.7 ft. MWM - Water Mark, 20 %of cross sectional area374.7 ft. MWL - Water Level, 10 %of cross sectional area374.7 ft. AMH - Downstream Manhole, Survey Begins - 20 0124

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0MWM
2SSS
255.9TFC
2SAP
372.5SAP
0MWL
351.3TBA
60.9TFC
156.5TFC
2DAGS
372.5DAGS
160.5TFC
56.5TFC
372.5SSS
252.6TFC
360.3TFC
355.6TFC
0AMH20 0124
374.7AMH20 0125

Properties (6)

additional_info
SC365939
custom_field_two
2
customer
LACSD
datetime
2019-03-12T00:40:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false