Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2019, 06:48 PM
  • 05 0470_05 0469_8132019_115136.mp4

Date
08/13/2019
W/O
0786503
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00526
PipeID
P05685
Time
11:48 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8053
Sewer Name
05 STRAWBERRY AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
20190812DF_STRAWBERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
05 0470
Downstream MH
05 0469
Dir. of Survey
Downstream
Length Surveyed
205.2 ft.
Total Length
205.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 0470 to 05 0469
MH: 05 0470MH: 05 0469downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:50 PM0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start48.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open50.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open90.5 ft. MGP - General Photograph94.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"94.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open96.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"202.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish202.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.2 ft. MGO - General Observation - ROACHES @ MH205.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN205.2 ft. MGO - General Observation - Conn. @ Mh, 12 O' Clock. Capped205.2 ft. AMH - Downstream Manhole, Survey Ends - 12:09 PM205.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active

Observation photos (4)

  • Upstream Manhole, Survey Begins - 11:50 PM

    0 ft. - Upstream Manhole, Survey Begins - 11:50 PM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    90.5 ft. - General Photograph

Observations (19)

DistanceCodeObservation
205.2MGOROACHES @ MH
94.1TFC
90.5MGP
2SSS
48.2TFOpen
202.7CM
2CM
94.8TBOpen
205.2MGOConn. @ Mh, 9 O' Clock. OPEN
50.7TFOpen
202.7SSS
205.2MGOConn. @ Mh, 12 O' Clock. Capped
0MWL
0MWM
96.7TFC
205.2AMH12:09 PM
0AMH11:50 PM
0MGOROACHES @ MH
205.2MGOConn. @ Mh, 3 O' Clock. Active

Properties (4)

customer
LACSD
datetime
2019-08-13T11:48:52-07:00
documentation
FRANKLIN, CASTILLO, RUVALCABA
is_lateral_inspection
false