Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2019, 06:23 PM
  • 05 0471_05 0470_8132019_112455.mp4

Date
08/13/2019
W/O
0786503
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00526
PipeID
P05686
Time
11:23 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8053
Sewer Name
05 STRAWBERRY AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
20190812DF_STRAWBERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
05 0471
Downstream MH
05 0470
Dir. of Survey
Downstream
Length Surveyed
207.7 ft.
Total Length
207.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 0471 to 05 0470
MH: 05 0471MH: 05 0470downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:23 AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start63.6 ft. MGP - General Photograph78.7 ft. MGP - General Photograph79.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open110.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open144.2 ft. MGP - General Photograph156 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"164.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open199.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open205.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish207.7 ft. AMH - Downstream Manhole, Survey Ends - 11:47 AM207.7 ft. MGO - General Observation - Grease Throughout The Reach (5%)207.7 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • Upstream Manhole, Survey Begins - 11:23 AM

    0 ft. - Upstream Manhole, Survey Begins - 11:23 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    63.6 ft. - General Photograph

  • General Photograph

    78.7 ft. - General Photograph

  • General Photograph

    144.2 ft. - General Photograph

Observations (18)

DistanceCodeObservation
2CM
78.7MGP
0AMH11:23 AM
207.7AMH11:47 AM
207.7MGOGrease Throughout The Reach (5%)
110.2TFOpen
63.6MGP
205.6SSS
156TFA
144.2MGP
79.9TFOpen
199.6TFOpen
2SSS
205.6CM
0MWL
0MWM
164.2TFOpen
207.7MGOROACHES @ MH

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-13T11:23:08-07:00
documentation
FRANKLIN, CASTILLO, RUVALCABA
is_lateral_inspection
false