Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2019, 05:19 PM
  • 05 0474_05 0473_8132019_102336.mp4

Date
08/13/2019
W/O
0786503
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00526
PipeID
P05689
Time
10:19 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8053
Sewer Name
05 STRAWBERRY AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
20190812DF_STRAWBERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
05 0473
Downstream MH
05 0474
Dir. of Survey
Upstream
Length Surveyed
270.6 ft.
Total Length
270.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 0473 to 05 0474
MH: 05 0473MH: 05 0474upstream0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 10:52 AM0.6 ft. MGO - General Observation - Grease Throughout The Reach (5%)0.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0.6 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN62.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"77.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"129.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"174.7 ft. MGP - General Photograph174.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"174.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open203.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"231.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"237.7 ft. MGP - General Photograph259.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"268.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start268.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start270.6 ft. AMH - Downstream Manhole, Survey Begins - 10:22 AM270.6 ft. MWL - Water Level, 10 %of cross sectional area270.6 ft. MGO - General Observation - ROACHES @ MH270.6 ft. MWM - Water Mark, 15 %of cross sectional area

Observation photos (5)

  • Downstream Manhole, Survey Begins - 10:22 AM

    0 ft. - Downstream Manhole, Survey Begins - 10:22 AM

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    32.9 ft. - General Photograph

  • General Photograph

    95.9 ft. - General Photograph

Observations (22)

DistanceCodeObservation
270MGOGrease Throughout The Reach (5%)
0AMH10:22 AM
38.9TFA
95.9MGP
32.9MGP
0MWL
67.3TF
95.9TFA
2CM
0MGOROACHES @ MH
95.9TFOpen
140.8TFC
207.7TFC
270.6CM
270MGOConn. @ Mh, 9 O' Clock. Active
192.9TFC
270MGOConn. @ Mh, 3 O' Clock. OPEN
0MWM
2SSS
270.6SSS
11.2TFA
270.6AMH10:52 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-13T10:19:24-07:00
documentation
FRANKLIN, CASTILLO, RUVALCABA
is_lateral_inspection
false