Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2019, 06:37 PM
  • 05 0465_04 0464_8122019_113927.mp4

Date
08/12/2019
W/O
0786503
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00526
PipeID
P05680
Time
11:37 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8052
Sewer Name
05 STRAWBERRY AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
20190812DF_STRAWBERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
05 0465
Downstream MH
04 0464
Dir. of Survey
Downstream
Length Surveyed
288.2 ft.
Total Length
288.2 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 05 0465 to 04 0464
MH: 05 0465MH: 04 0464downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:38 AM0 ft. MGO - General Observation - ROACHES @ MH2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"41.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"43.8 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - OPEN53 ft. MWL - Water Level, 15 %of cross sectional area53 ft. MWM - Water Mark, 20 %of cross sectional area53 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start62.7 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish90 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"91.4 ft. MGP - General Photograph92.7 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open110.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES111 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN113.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"143.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"144 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"180.5 ft. MGP - General Photograph192.8 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"195.3 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"241.6 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"244.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open285.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish288.2 ft. MGO - General Observation - ROACHES @ MH288.2 ft. AMH - Downstream Manhole, Survey Ends - 12:06 PM288.2 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (8)

  • Upstream Manhole, Survey Begins - 11:38 AM

    0 ft. - Upstream Manhole, Survey Begins - 11:38 AM

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"

    37.9 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"

  • General Photograph

    91.4 ft. - General Photograph

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    110.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"

    144 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"

  • General Photograph

    180.5 ft. - General Photograph

Observations (31)

DistanceCodeObservation
41.2TFC
92.7TFOpen
285.5CM
288.2MGOROACHES @ MH
2CM
0MWL
43.8TFOPEN
90TFA
180.5MGP
288.2AMH12:06 PM
0MWM
53MWL
2SSS
192.8TFA
241.6TFA
53MWM
144TBA
244.2TFOpen
110.9DAGS
91.4MGP
37.9TBA
53MWLS
111TBOPEN
0AMH11:38 AM
62.7MWLS
195.3TFA
288.2MGOGREASE THROUGHOUT THE REACH (5%)
143.9TFC
285.5SSS
113.2TFC
0MGOROACHES @ MH

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-12T11:37:20-07:00
documentation
FRANKLIN, CASTILLO, RUVALCABA
is_lateral_inspection
false