05 0465_04 0464_8122019_113927.mp4
0 ft. - Upstream Manhole, Survey Begins - 11:38 AM
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
37.9 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
91.4 ft. - General Photograph
110.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
144 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
180.5 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 41.2 | TFC | — |
| 92.7 | TF | Open |
| 285.5 | CM | — |
| 288.2 | MGO | ROACHES @ MH |
| 2 | CM | — |
| 0 | MWL | — |
| 43.8 | TF | OPEN |
| 90 | TFA | — |
| 180.5 | MGP | — |
| 288.2 | AMH | 12:06 PM |
| 0 | MWM | — |
| 53 | MWL | — |
| 2 | SSS | — |
| 192.8 | TFA | — |
| 241.6 | TFA | — |
| 53 | MWM | — |
| 144 | TBA | — |
| 244.2 | TF | Open |
| 110.9 | DAGS | — |
| 91.4 | MGP | — |
| 37.9 | TBA | — |
| 53 | MWLS | — |
| 111 | TB | OPEN |
| 0 | AMH | 11:38 AM |
| 62.7 | MWLS | — |
| 195.3 | TFA | — |
| 288.2 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 143.9 | TFC | — |
| 285.5 | SSS | — |
| 113.2 | TFC | — |
| 0 | MGO | ROACHES @ MH |