05 0467_05 0466_8122019_103629.mp4
0 ft. - Upstream Manhole, Survey Begins - 10:34 AM
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
15.8 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Active
19.8 ft. - General Photograph
21.6 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open
89.6 ft. - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES
135.6 ft. - General Photograph
151.1 ft. - Fracture Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES
205.1 ft. - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 257.2 | TFC | — |
| 175.4 | TFA | — |
| 89.6 | FL | — |
| 135.6 | MGP | — |
| 287.7 | CM | — |
| 254.6 | TFC | — |
| 291.6 | MGO | ROACHES @ MH |
| 0.1 | MWM | — |
| 157.4 | TF | Open |
| 0.1 | MWL | — |
| 291.6 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 0.1 | MGO | ROACHES @ MH |
| 72.9 | TFA | — |
| 2 | CM | — |
| 291.6 | MGO | Grease Throughout The Reach (5%) |
| 206.1 | TF | Open |
| 152.4 | TF | Open |
| 291.6 | AMH | 11:03 AM |
| 106.3 | TFA | — |
| 15.8 | TFD | Active |
| 205.1 | FS | — |
| 19.8 | MGP | — |
| 287.7 | SSS | — |
| 151.1 | FS | — |
| 0 | AMH | 10:34 AM |
| 291.6 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 2 | SSS | — |
| 21.6 | TFD | Open |