Section#9_E 0114_E 0113__8152019__I0216.mp4
2 ft. - General Observation - M,AG COAT 98% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
26.9 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
56.4 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
126.5 ft. - Surface Spalling, from 01 to 03 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE
301.6 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
474.5 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 301.6 | SSS | BLISTERING PEELING CONCRETE |
| 580.3 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 580.3 | MGO | 95% MAG COAT FINISH |
| 0 | MWM | — |
| 56.4 | SSS | BLISTERING CONCRETE |
| 2 | MGO | M,AG COAT 98% START |
| 0 | MWL | — |
| 126.5 | SSS | BLISTERING PEELING CONCRETE |
| 26.9 | SSS | BLISTERING CONCRETE |
| 581 | AMH | 4:25AM |
| 474.5 | SSS | BLISTERING CONCRETE |
| 0 | AMH | 3:45AM |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 314.1 | MGO | 95% MAG COAT START |