Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2019, 12:24 PM
  • Section#11_E 0112_E 0111__8152019__I0217.mp4

Date
08/15/2019
W/O
0784628
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00032
PipeID
P11338
Time
5:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0217
Sewer Name
E JOINT OUTFALL E - UNIT 5
City
WILLOWBROOK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
20190813MDM_JOINT_OUTFALL_E_UNIT_5
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
E 0112
Downstream MH
E 0111
Dir. of Survey
Downstream
Length Surveyed
45.7 ft.
Total Length
45.7 ft.
Structural Index
3
Structural Quick
513A
Structural Rating
55
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
55
Pipe schematic from manhole E 0112 to E 0111
MH: E 0112MH: E 0111downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:25AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG10.8 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG22 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG22 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG25.2 ft. SRV - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR SURFACE REBAR30.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE36.2 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG36.2 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG45 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG45 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE45 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG45 ft. MGO - General Observation - MH CONN 9:00 STUB45.7 ft. AMH - Downstream Manhole, Survey Ends - 5:40AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2.4 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    10.8 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR SURFACE REBAR

    25.2 ft. - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR SURFACE REBAR

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    30.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    36.2 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    36.2 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

Observations (19)

DistanceCodeObservation
45.7AMH5:40AM
2.4SAPSEVERE AGG
45SAPSEVERE AGG
22SAPSEVERE AGG
45SSSBLISTERING PEELING CONCRETE
36.2SAPSEVERE AGG
0MWM
0AMH5:25AM
30.4SSSPEELING CONCRETE
0MWL
45SAPSEVERE AGG
0MGOMH CONN 9:00 ACTIVE
22SAPSEVERE AGG
10.8SAPSEVERE AGG
25.2SRVCIRCUM REBAR SURFACE REBAR
2SSSBLISTERING PEELING CONCRETE
45MGOMH CONN 9:00 STUB
36.2SAPSEVERE AGG
0MGOMH CONN 3:00 ACTIVE

Properties (6)

custom_field_three
SEVERE AGG PROJECTING-SURFACE CIRCUM REBAR
custom_field_two
3
customer
LACSD
datetime
2019-08-15T05:24:07-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false