Section#7_E 0108_E 0107__8152019__I0216.mp4
2 ft. - General Observation - MAG COAT 100% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
32.4 ft. - General Observation - 100% MAG COAT THICK
39.1 ft. - Surface Spalling, from 09 to 10 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
60.5 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
65.5 ft. - General Observation - 98% MAG COAT START
114.8 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
201.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
277 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
396.4 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
578.2 ft. - Surface Spalling, from 01 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETEW
| Distance | Code | Observation |
|---|---|---|
| 2 | MGO | MAG COAT 100% START |
| 277 | SSS | BLISTERING PEELING CONCRETE |
| 39.1 | SSS | BLISTERING CONCRETE |
| 0 | AMH | 1:20AM |
| 675 | AMH | 2:10AM |
| 512.5 | MWL | — |
| 0 | MWM | — |
| 674.2 | MGO | 98% MAG COAT FINISH |
| 60.5 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 396.4 | SSS | PEELING CONCRETE |
| 0 | MWL | — |
| 578.2 | SSS | PEELING CONCRETEW |
| 32.4 | MGO | 100% MAG COAT THICK |
| 512.5 | MWM | — |
| 674.2 | MGO | MH CONN 3:00 ACTIVE |
| 114.8 | SSS | BLISTERING CONCRETE |
| 201.2 | SSS | BLISTERING PEELING CONCRETE |
| 674.2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 65.5 | MGO | 98% MAG COAT START |