Section#6_E 0115_E 0114__8142019__I0215.mp4
2 ft. - General Observation - 98% MAG COAT START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
77.5 ft. - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT
112.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRET UNDER MAG COAT

189.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR POSSIBLE UNDER MAG COAT
189.8 ft. - Surface Aggregate Visible, from 11 to 12 o'clock, within 8 inches of joint: YES - 2 SEVERE AGGS
279.5 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
396.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR UNDER MAG COAT
405.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR POSSIBLE
| Distance | Code | Observation |
|---|---|---|
| 112.2 | SSS | BLISTERING PEELING CONCRET UNDER MAG COAT |
| 603.9 | AMH | 5:10AM |
| 0 | MWL | — |
| 189.8 | SRV | CIRCUM REBAR POSSIBLE UNDER MAG COAT |
| 2 | MGO | 98% MAG COAT START |
| 77.5 | SSS | PEELING CONCRETE UNDER MAG COAT |
| 189.8 | SAV | 2 SEVERE AGGS |
| 405.8 | SRV | CIRCUM REBAR POSSIBLE |
| 396.9 | SRV | CIRCUM REBAR UNDER MAG COAT |
| 0 | AMH | 4:25AM |
| 601 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | MWM | — |
| 279.5 | SSS | BLISTERING CONCRETE |
| 601 | MGO | 98% MAG COAT FINISH |