Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 14, 2019, 07:38 AM
  • Section#4_E 0117_E 0116__8142019__I0215.mp4

Date
08/14/2019
W/O
0784628
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00032
PipeID
P11343
Time
12:38 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0215
Sewer Name
E JOINT OUTFALL E - UNIT 5
City
WILLOWBROOK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
20190813MDM_JOINT_OUTFALL_E_UNIT_5
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
E 0117
Downstream MH
E 0116
Dir. of Survey
Downstream
Length Surveyed
130.9 ft.
Total Length
130.9 ft.
Structural Index
2
Structural Quick
2E00
Structural Rating
58
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
58
Pipe schematic from manhole E 0117 to E 0116
MH: E 0117MH: E 0116downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTARING PEELING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - 95% MAG COAT START22.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE76.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT93.7 ft. SSS - Surface Spalling, from 01 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE130.4 ft. MGO - General Observation - 95% MAG COAT FINISH130.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT130.9 ft. AMH - Downstream Manhole, Survey Ends - 1:05AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTARING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTARING PEELING CONCRETE UNDER MAG COAT

  • General Observation - 95% MAG COAT START

    2 ft. - General Observation - 95% MAG COAT START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    22.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT

    76.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 01 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    93.7 ft. - Surface Spalling, from 01 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

Observations (11)

DistanceCodeObservation
0MWM
22.7SSSBLISTERING PEELING CONCRETE
130.9AMH1:05AM
130.4MGO95% MAG COAT FINISH
2SSSBLISTARING PEELING CONCRETE UNDER MAG COAT
76.2SSSBLISTERING CONCRETE UNDER MAG COAT
130.4SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
0AMH12:45AM
93.7SSSBLISTERING CONCRETE
0MGOMH CONN 9:00 ACTIVE
2MGO95% MAG COAT START

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE UNDER 95% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2019-08-14T00:38:48-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false