Section#3_E 0118_E 0117__8132019__I0214.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
4.2 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
5.2 ft. - General Observation - MAG COAT 90% START
19.4 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
169.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
413.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE UNDER MAG COAT
498.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
598.9 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
748.3 ft. - General Observation - 90% MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 4:45AM |
| 169.2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 645.3 | TF | OPEN |
| 748.3 | MGO | 90% MAG COAT |
| 19.4 | SSS | PEELING CONCRETE |
| 815.3 | MGO | MMH CONN 9:00 ACTIVE LARGE |
| 498.2 | SSS | PEELING CONCRETE |
| 5.2 | MGO | MAG COAT 90% START |
| 0 | MWL | — |
| 815.3 | MGO | MH CONN 3:00 OPEN LARGE |
| 598.9 | SAP | SEVERE AGG SPORATIC |
| 0 | MWM | — |
| 413.4 | SSS | BLISTERING CONCRETE UNDER MAG COAT |
| 815.3 | SSS | BLISTERING PEELING CONCRETE |
| 815.3 | MGO | 90% MAG COAT FINISH |
| 815.8 | AMH | 5:35AM |
| 4.2 | SAP | SEVERE AGG SPORATIC |