Section#1_E 0120_E 0119__8132019__I0214.mp4
2 ft. - General Observation - MAG COAT 98% START
25 ft. - Material Change, Vitrified clay pipe - START
50.7 ft. - General Observation - 100% MAG COAT
353 ft. - General Observation - 100% THIN WHITE COATING ON PIPE
356.1 ft. - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - HAIRLINE
398.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
398.3 ft. - General Observation - MAG COAT 98% START
427.1 ft. - Surface Spalling, from 09 to 10 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT
499 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELED CONCRETE UNDRE MAG COAT
528.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 398.3 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | AMH | 1:15AM |
| 2 | MGO | MAG COAT 98% START |
| 398.3 | MMC | FINISH |
| 499 | SSS | PEELED CONCRETE UNDRE MAG COAT |
| 580.1 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 528.7 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 353 | MGO | 100% THIN WHITE COATING ON PIPE |
| 427.1 | SSS | BLISTERING CONCRETE UNDER MAG COAT |
| 398.3 | MGO | MAG COAT 98% START |
| 25 | MMC | START |
| 0 | MWL | — |
| 582.8 | AMH | 2:00AM |
| 356.1 | FC | HAIRLINE |
| 0 | MWM | — |
| 580.1 | MGO | 98% MAG COAT FINISH |
| 50.7 | MGO | 100% MAG COAT |