Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 8, 2019, 06:19 AM
  • 13_1_1_07052019_233031.mp4

Date
05/07/2019
W/O
761426
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00141
PipeID
P24007
Time
11:19 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6534
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
WO_761426_TV19012_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
19 0079
Downstream MH
C 0372
Dir. of Survey
Downstream
Length Surveyed
10 ft.
Total Length
10 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 19 0079 to C 0372
MH: 19 0079MH: C 0372downstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - STOP LOG IN PLACE AT 6'00 ft. AMH - Upstream Manhole, Survey Begins - 19 00790 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start10 ft. AMH - Downstream Manhole, Survey Ends - C 037210 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish10 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish10 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
10AMHC 0372
10DAGS
0DAGS
1SAP
10SAP
0MWL
0MWM
10SSS
0MGOSTOP LOG IN PLACE AT 6'0
0AMH19 0079
0SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-07T23:19:37-07:00
documentation
PROPIPE
is_lateral_inspection
false