11_1_1_11042019_222528.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
109.4 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAG COAT
240.7 ft. - Infiltration Runner, at 08 o'clock, within 8 inches of joint: YES
247.5 ft. - Infiltration Runner, at 08 o'clock, within 8 inches of joint: YES
292.5 ft. - Infiltration Gusher, from 01 to 05 o'clock, within 8 inches of joint: YES
292.5 ft. - Alignment Right, 15 %
295.6 ft. - Infiltration Gusher, at 10 o'clock, within 8 inches of joint: YES
314.2 ft. - Alignment Right, 20 %
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 292.5 | IR | — |
| 2 | SSS | — |
| 0 | AMH | C 0381 |
| 2 | DAGS | — |
| 333 | SAP | — |
| 333 | SSS | — |
| 333 | DAZ | MAG COAT |
| 247.5 | IR | — |
| 295.6 | IG | — |
| 240.7 | IR | — |
| 2 | SAP | — |
| 335 | DAGS | — |
| 292.5 | LR | — |
| 314.2 | LR | — |
| 109.4 | DAZ | MAG COAT |
| 335.9 | AMH | C 0380 |
| 0 | MWM | — |