7_1_3_12042019_021424.mp4
3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
3.1 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MAG COAT
57.8 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
65.7 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES
83 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
129.7 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
219.2 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
227.6 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
274.5 ft. - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES
534.4 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
542 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
615 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
619.7 ft. - Alignment Right, 25 %
629.4 ft. - Infiltration Dripper, at 04 o'clock, within 8 inches of joint: YES
633.9 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
641.9 ft. - General Observation - CONNECTION AT MH 3 O'CLOCK
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 3 | SAP | — |
| 619.7 | LR | — |
| 641.9 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 0 | AMH | C 0377 |
| 83 | ID | — |
| 641.7 | SAP | — |
| 643.4 | AMH | C 0376 |
| 219.2 | ID | — |
| 65.7 | IR | — |
| 615 | IG | — |
| 274.5 | ID | — |
| 509.1 | SRV | — |
| 633.9 | IG | — |
| 57.8 | IG | — |
| 641 | SSS | — |
| 227.6 | IG | — |
| 129.7 | ID | — |
| 629.4 | ID | — |
| 3.1 | DAZ | MAG COAT |
| 641.7 | DAZ | — |
| 3 | SSS | — |
| 542 | ID | — |
| 0 | MWL | — |
| 534.4 | IG | — |