3_1_1_15042019_235244.mp4
10 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
75.3 ft. - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES
246.4 ft. - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES
254.3 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
349 ft. - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES
349 ft. - Infiltration Stain, at 11 o'clock, within 8 inches of joint: YES
446.8 ft. - Infiltration Stain, at 12 o'clock, within 8 inches of joint: YES
471.4 ft. - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES
527 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
566.7 ft. - Infiltration Runner, from 12 to 03 o'clock, within 8 inches of joint: YES
575.3 ft. - Infiltration Runner, from 10 to 12 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 619.4 | DAGS | — |
| 10 | MGO | MAG COAT THROUGHOUT START |
| 349 | ID | — |
| 619.4 | MGO | INFILTRATION IN MH |
| 384.2 | IS | — |
| 510.9 | IG | — |
| 196.2 | IS | — |
| 75.3 | IS | — |
| 0 | MWM | — |
| 2 | SSS | — |
| 619.4 | AMH | C 0370 |
| 0 | MWL | — |
| 619.4 | MGO | CONNECTION AT MH 9 O'CLOCK CAPPED |
| 10 | SAP | — |
| 471.4 | ID | — |
| 446.8 | IS | — |
| 454.8 | ID | — |
| 254.3 | IG | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 415.8 | IS | — |
| 566.7 | IR | — |
| 575.3 | IR | — |
| 246.4 | IS | — |
| 615.2 | MGO | MAG COAT THROUGHOUT END |
| 619.4 | SSS | — |
| 527 | ID | — |
| 349 | IS | — |
| 422 | IS | — |
| 615.2 | SAP | — |
| 0 | AMH | C 0371 |
| 367.1 | IS | — |
| 2 | DAGS | — |