Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2019, 05:11 AM
  • 14 0680_14 0679 _06032019_221534.mp4

Date
06/03/2019
W/O
671823
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00568
PipeID
P18769
Time
10:11 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6550
Sewer Name
14 AMARGOSA CREEK TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
28
Purpose
Routine Assessment
Project
WO_671823_TV14005_MAY2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0680
Downstream MH
14 0679
Dir. of Survey
Downstream
Length Surveyed
40.7 ft.
Total Length
40.7 ft.
Structural Index
2
Structural Quick
2700
Structural Rating
14
O&M Index
2
O&M Quick
2B00
O&M Rating
28
Overall Index
2
Overall Quick
Overall Rating
42
Pipe schematic from manhole 14 0680 to 14 0679
MH: 14 0680MH: 14 0679downstream0 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6" - IN MH0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 6" - IN MH0 ft. AMH - Upstream Manhole, Survey Begins - 14 06800 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish38.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish39 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish40.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6" - IN MH40.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 6" - IN MH40.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0679

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MINERALS

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS

Observations (14)

DistanceCodeObservation
40.7AMH14 0679
0TFCIN MH
2DAGS
38.1DAGS
39SSS
2DAZMINERALS
2SSS
0MWM
0TFIN MH
40.1TFCIN MH
38.1DAZ
40.1TFCIN MH
0AMH14 0680
0MWL

Properties (7)

additional_info
SC378165
custom_field_two
4
customer
LACSD
datetime
2019-06-03T22:11:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
31748