Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 11:45 AM
  • 15 0784_15 0783_02202019_034509.mp4

Date
02/20/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12984
Time
3:45 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6400
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0784
Downstream MH
15 0783
Dir. of Survey
Downstream
Length Surveyed
64.7 ft.
Total Length
64.7 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
36
O&M Index
2
O&M Quick
2A00
O&M Rating
24
Overall Index
3
Overall Quick
Overall Rating
60
Pipe schematic from manhole 15 0784 to 15 0783
MH: 15 0784MH: 15 0783downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 07840 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.8 ft. MGO - General Observation - MAG COATING 40% THROUGHOUT.2.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"54.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"63.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish63.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish64.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK.64.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0783,RUN LIST STATES MH AT 53'.

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Downstream Manhole, Survey Ends - 15 0783,RUN LIST STATES MH AT 53'.

    64.7 ft. - Downstream Manhole, Survey Ends - 15 0783,RUN LIST STATES MH AT 53'.

Observations (12)

DistanceCodeObservation
2DAGS
63.2SAV
0AMH15 0784
0MWM
0MWL
54.7TFC
2.8MGOMAG COATING 40% THROUGHOUT.
24.3TF
2.8SAV
64.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK.
64.7AMH15 0783,RUN LIST STATES MH AT 53'.
63.2DAGS

Properties (6)

additional_info
SC365912
custom_field_two
2
customer
LACSD
datetime
2019-02-20T03:45:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false