Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 09:03 AM
  • 15 0777_15 0776 _02202019_010347.mp4

Date
02/20/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12978
Time
1:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6400
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0777
Downstream MH
15 0776
Dir. of Survey
Downstream
Length Surveyed
220.2 ft.
Total Length
220.2 ft.
Structural Index
3
Structural Quick
3H2G
Structural Rating
211
O&M Index
2
O&M Quick
2H00
O&M Rating
86
Overall Index
2
Overall Quick
Overall Rating
297
Pipe schematic from manhole 15 0777 to 15 0776
MH: 15 0777MH: 15 0776downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 07770 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start60.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"63.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"105.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"108.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"159.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"218.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish218.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish218.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish220.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0776220.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
220.2AMH15 0776
0AMH15 0777
108.1TFA
105.4TFA
159.4TF
218.3SSS
156.6TFA
60.7TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
63.1TFC
11.7SSS
218.3DAGS
0MWM
2DAGS
0MWL
220.2MGOACTIVE CONNECTION AT MH 3 O'CLOCK
218.3SAP
2SAP

Properties (6)

additional_info
SC365912
custom_field_two
2
customer
LACSD
datetime
2019-02-20T01:03:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false