Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 09:18 AM
  • 15 0776_15 0775 _02202019_011810.mp4

Date
02/20/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12977
Time
1:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6400
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0776
Downstream MH
15 0775
Dir. of Survey
Downstream
Length Surveyed
395.7 ft.
Total Length
395.7 ft.
Structural Index
3
Structural Quick
433P
Structural Rating
423
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
581
Pipe schematic from manhole 15 0776 to 15 0775
MH: 15 0776MH: 15 0775downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07760 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start88.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"93.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"121 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.3 ft. RTJ - Roots Tap Joint, from 01 to 03 o'clock, 10 %, within 8 inches of joint: YESR144.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.3 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"228.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"231.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.1 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"313.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"342.3 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES, Start376.5 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES, Finish376.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start393.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish393.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish393.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish393.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Finish395.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK395.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0775395.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Tap Joint, from 01 to 03 o'clock, 10 %, within 8 inches of joint: YESR

    140.3 ft. - Roots Tap Joint, from 01 to 03 o'clock, 10 %, within 8 inches of joint: YESR

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES, Start

    342.3 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    376.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    395.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (31)

DistanceCodeObservation
166.3TF
228.9TF
88.7TB
395.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
241.3TFC
393.9FM
0MWL
376.5FL
0MWM
121TFC
2DAGS
6.2SSS
2SAP
0AMH15 0776
342.3FL
393.9SAP
376.5FM
248.1TBA
96.8TFC
144.9TF
93.6TFC
395.7AMH15 0775
140.3RTJ
231.8TF
117.8TFC
313.8TFA
393.9SSS
395.7MGOCOCKROACHES IN MANHOLE
393.9DAGS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
214.3TB

Properties (6)

additional_info
SC365912
custom_field_two
2
customer
LACSD
datetime
2019-02-20T01:18:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false