Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 10:08 AM
  • 15 0774_15 0773 _02202019_020818.mp4

Date
02/20/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12975
Time
2:08 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6400
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0774
Downstream MH
15 0773
Dir. of Survey
Downstream
Length Surveyed
197.3 ft.
Total Length
197.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
193
O&M Index
2
O&M Quick
2G11
O&M Rating
79
Overall Index
2
Overall Quick
Overall Rating
272
Pipe schematic from manhole 15 0774 to 15 0773
MH: 15 0774MH: 15 0773downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07740 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.4 ft. RFJ - Roots Fine Joint, from 01 to 02 o'clock, within 8 inches of joint: YESR106.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"160.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"195 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish195 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish197.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK197.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0773

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 01 to 02 o'clock, within 8 inches of joint: YESR

    9.4 ft. - Roots Fine Joint, from 01 to 02 o'clock, within 8 inches of joint: YESR

Observations (15)

DistanceCodeObservation
9.4RFJ
0MWM
160.1TFC
195SSS
0AMH15 0774
195SAP
0MWL
197.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
109.5TFC
197.3AMH15 0773
106.7TFC
3.8SSS
2DAGS
195DAGS
2SAP

Properties (6)

additional_info
SC365912
custom_field_two
2
customer
LACSD
datetime
2019-02-20T02:08:03-08:00
documentation
PRO PIPE
is_lateral_inspection
false