15 0771_15 0770 _02192019_025829.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
14 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
129 ft. - Roots Fine Joint, at 02 o'clock, within 8 inches of joint: YESR
164.1 ft. - Roots Medium Joint, from 08 to 10 o'clock, 10 %, within 8 inches of joint: YESR
226.2 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Start
279.8 ft. - Roots Fine Lateral, from 07 to 11 o'clock
| Distance | Code | Observation |
|---|---|---|
| 396.6 | SAP | — |
| 279.8 | TFA | — |
| 276.4 | TFC | — |
| 158.8 | TF | — |
| 337.3 | TFC | — |
| 309.9 | TBA | — |
| 340.2 | TFC | — |
| 279.8 | RFL | — |
| 129 | RFJ | — |
| 164.1 | RMJ | — |
| 107.6 | TF | — |
| 14 | SSS | — |
| 0 | MWM | — |
| 104.4 | TFA | — |
| 0 | AMH | 15 0771 |
| 398.7 | MGO | ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK |
| 2 | DAGS | — |
| 161.6 | TFA | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK |
| 334.2 | RFJ | — |
| 398.7 | AMH | 15 0770 |
| 0 | MWL | — |
| 396.6 | DAGS | — |
| 57.2 | TBA | — |
| 92.8 | TFA | — |
| 396.6 | SSS | — |
| 226.2 | RFJ | — |
| 2 | SAP | — |