Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 06:12 AM
  • 15 0769_15 0768 _02192019_221157.mp4

Date
02/19/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12970
Time
10:12 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6400
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0769
Downstream MH
15 0768
Dir. of Survey
Downstream
Length Surveyed
202.1 ft.
Total Length
202.1 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
2G00
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
273
Pipe schematic from manhole 15 0769 to 15 0768
MH: 15 0769MH: 15 0768downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07690 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start22.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.4 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"161.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"199.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish199.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish199.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish202.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK202.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0768

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
22.8TFC
202.1MGOACTIVE CONNECTION AT MH 3 O'CLOCK
6.3SSS
0MWL
199.3DAGS
2DAGS
0AMH15 0769
98.4TBA
199.3SSS
161.6TBA
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SAP
199.3SAP
0MWM
202.1AMH15 0768

Properties (6)

additional_info
SC365912
custom_field_two
2
customer
LACSD
datetime
2019-02-19T22:12:01-08:00
documentation
PRO PPE
is_lateral_inspection
false