Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 06:22 AM
  • 15 0768_15 0767 _02192019_222213.mp4

Date
02/19/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12969
Time
10:22 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6400
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0768
Downstream MH
15 0767
Dir. of Survey
Downstream
Length Surveyed
199.1 ft.
Total Length
199.1 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
412G
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
277
Pipe schematic from manhole 15 0768 to 15 0767
MH: 15 0768MH: 15 0767downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07680 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start74.2 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"74.2 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"113.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"197 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish197 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish197 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish199.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK199.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0767

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
113.7TFA
74.2TBA
197SSS
116.7TFA
0MWM
0MWL
199.1MGOACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK
199.1AMH15 0767
2SAP
197DAGS
0AMH15 0768
3.4SSS
2DAGS
197SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
74.2TBA

Properties (6)

additional_info
SC365912
custom_field_two
2
customer
LACSD
datetime
2019-02-19T22:22:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false