Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2019, 06:28 AM
  • 15 0759A_15 0759 _02202019_224715.mp4

Date
02/20/2019
W/O
750672
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12961
Time
10:28 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6401
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0759A
Downstream MH
15 0759
Dir. of Survey
Downstream
Length Surveyed
155.9 ft.
Total Length
155.9 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
150
O&M Index
2
O&M Quick
412E
O&M Rating
64
Overall Index
2
Overall Quick
Overall Rating
214
Pipe schematic from manhole 15 0759A to 15 0759
MH: 15 0759AMH: 15 0759downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 0759A2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"73.9 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"80 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"83 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"110.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"154 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish154 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish154 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish155.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0759

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0MWL
73.9TBA
154SSS
83TFC
154SAP
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
0AMH15 0759A
80TFA
2DAGS
5.3SSS
2SAP
9.9TFC
110.6TBA
155.9AMH15 0759
154DAGS

Properties (6)

additional_info
SC365913
custom_field_two
2
customer
LACSD
datetime
2019-02-20T22:28:05-08:00
documentation
PRO PIPE
is_lateral_inspection
false