Wastewater/Activity/PacpInspection/1.0Feb 21, 2019, 06:56 AM
  • 15 0759_15 0758 _02202019_225609.mp4

Date
02/20/2019
W/O
750672
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12960
Time
10:56 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6401
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0759
Downstream MH
15 0758
Dir. of Survey
Downstream
Length Surveyed
327.4 ft.
Total Length
327.4 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
323
O&M Index
2
O&M Quick
412L
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
457
Pipe schematic from manhole 15 0759 to 15 0758
MH: 15 0759MH: 15 0758downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07592 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19.1 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"39.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.3 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"117.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"120.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"184.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"251.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"325.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish325.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish325.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish327.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0758

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
241.9TFA
251.6TBA
2SAP
5.5SSS
120.9TFC
117.9TFA
0MWM
19.1TBA
69.9TFC
39.1TFA
2DAGS
98.3TBA
184.9TF
325.8DAGS
0MWL
327.4AMH15 0758
218.1TFA
181.5TFC
325.8SAP
325.8SSS
0AMH15 0759

Properties (6)

additional_info
SC365913
custom_field_two
2
customer
LACSD
datetime
2019-02-20T22:56:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false