Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2019, 10:15 AM
  • 15 0863_15 0745 _02212019_021601.mp4

Date
02/21/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12945
Time
2:15 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6401
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0863
Downstream MH
15 0745
Dir. of Survey
Downstream
Length Surveyed
259.7 ft.
Total Length
259.7 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
357
Pipe schematic from manhole 15 0863 to 15 0745
MH: 15 0863MH: 15 0745downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 08630 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start96.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"172 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"198.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"240.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"242.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"258 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish258 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish258 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish259.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0745

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0AMH15 0863
2DAGS
96.8TFA
0MWL
0MWL
259.7AMH15 0745
258SSS
172TFA
2SSS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
118.4TFA
258DAGS
242.9TBA
157.9TBA
258SAP
240.9TFA
198.9TFC
2SAP

Properties (6)

additional_info
SC365913
custom_field_two
2
customer
LACSD
datetime
2019-02-21T02:15:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false