Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 22, 2019, 06:04 AM
  • 15 0742_15 0741 _02212019_220402.mp4

Date
02/21/2019
W/O
750672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00593
PipeID
P12941
Time
10:04 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6402
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_750672_TV15146_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0742
Downstream MH
15 0741
Dir. of Survey
Downstream
Length Surveyed
346.4 ft.
Total Length
346.4 ft.
Structural Index
3
Structural Quick
3M22
Structural Rating
208
O&M Index
2
O&M Quick
412M
O&M Rating
140
Overall Index
3
Overall Quick
Overall Rating
348
Pipe schematic from manhole 15 0742 to 15 0741
MH: 15 0742MH: 15 0741downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07420 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start89.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"256.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"294.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"344.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish344.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish344.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish346.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK346.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0741

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
344.4DAGS
346.4MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SAP
294.3TF
0MWL
189.1TFC
346.4AMH15 0741
186.1TFA
0AMH15 0742
0MWM
5.6SSS
344.4SAP
89.4TFA
344.4SSS
2DAGS
256.2TBA

Properties (6)

additional_info
SC365914
custom_field_two
2
customer
LACSD
datetime
2019-02-21T22:04:04-08:00
documentation
PRO PIPE
is_lateral_inspection
false