Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2019, 03:44 PM
  • 15 0263_15 0262_06172019_093348.mp4

Date
06/17/2019
W/O
766400
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00627
PipeID
P12186
Time
8:44 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6655
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_766400_TV15133_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0263
Downstream MH
15 0262
Dir. of Survey
Downstream
Length Surveyed
403.8 ft.
Total Length
403.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole 15 0263 to 15 0262
MH: 15 0263MH: 15 0262downstream0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02637.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start15.6 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start129.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"194.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"299.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"388.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"401.4 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish401.4 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish403.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0262

Observation photos (2)

  • General Observation - MAGNEZIUM H.O COATING start

    7.9 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    15.6 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWM
194.5TFC
388.1TFA
129.5TFC
15.6SAV
401.4SAV
0MWL
403.8AMH15 0262
299.5TFC
7.9MGOMAGNEZIUM H.O COATING start
0AMH15 0263
401.4MGOMAGNEZIUM H.O COATING finish

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-06-17T08:44:15-07:00
documentation
PROPIPE
is_lateral_inspection
false