Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 23, 2019, 04:05 PM
  • 15 0267_15 0266_07232019_103602.mp4

Date
07/23/2019
W/O
766400
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00627
PipeID
P12190
Time
9:05 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6768
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
WO_766400_TV15133_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0267
Downstream MH
15 0266
Dir. of Survey
Downstream
Length Surveyed
451.4 ft.
Total Length
451.4 ft.
Structural Index
3
Structural Quick
3Q00
Structural Rating
267
O&M Index
2
O&M Quick
2Q11
O&M Rating
179
Overall Index
2
Overall Quick
Overall Rating
446
Pipe schematic from manhole 15 0267 to 15 0266
MH: 15 0267MH: 15 0266downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 02670 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area1.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH1.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start117.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"195 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"299.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"350.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4"395.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"449.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish449.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish451.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0266

Observation photos (3)

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    1.9 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0AMH15 0267
117.3TFC
195TFC
0VC
299.4TFC
0MWL
1.9MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
0MWM
451.4AMH15 0266
1.9SAP
449.2DAGS
1.9DAGS
395.8TFC
449.3SAP
350.7TB

Properties (6)

additional_info
SC378273
custom_field_two
3
customer
LACSD
datetime
2019-07-23T09:05:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false