Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 17, 2019, 07:42 PM
  • 15 0261_15 0260_06172019_130630.mp4

Date
06/17/2019
W/O
766400
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00627
PipeID
P12184
Time
12:42 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6655
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
34
Purpose
Routine Assessment
Project
WO_766400_TV15133_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0261
Downstream MH
15 0260
Dir. of Survey
Downstream
Length Surveyed
442.4 ft.
Total Length
442.4 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0261 to 15 0260
MH: 15 0261MH: 15 0260downstream0 ft. MWL - Water Level, 65 %of cross sectional area0 ft. MWM - Water Mark, 70 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 02617.9 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start7.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING start67.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"122.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"138.2 ft. B - Broken, from 11 to 01 o'clock, within 8 inches of joint: YES196 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"297.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"392 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"441.9 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish441.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish442.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0260

Observation photos (3)

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    7.9 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING start

    7.9 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Broken, from 11 to 01 o'clock, within 8 inches of joint: YES

    138.2 ft. - Broken, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
442.4AMH15 0260
441.9SAV
138.2B
7.9SAV
392TFC
0MWL
441.9MGOMAGNEZIUM H.O COATING finish
0MWM
297.8TFC
67.9TFC
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
122.8TFC
7.9MGOMAGNEZIUM H.O COATING start
196TFC
0AMH15 0261

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-06-17T12:42:19-07:00
documentation
PROPIPE
is_lateral_inspection
false